Enabling Phase
June 2023-June 2025
The Enabling Phase will run through June 2025. This phase includes the development of schematic design, construction documentation, and the creation and advertisement for bid packages.
Enabling Project Recommendation
The formal Enabling Phase recommendation, which included the final list of projects to be executed, associated construction costs, total projected phase costs, and the recommended trade vendor for each package, are featured in the March 2024 District 115 Board of Education packet. As we progressed through the design process, we strategically reallocated elements of the project scope between phases to create additional flexibility and ensure the referendum's objectives were achieved more efficiently.
The combined bids from the lowest and most responsive bidders for the 14 bid packages amounted to $5,723,503, which is $1,039,948 less than initially projected. This favorable outcome stems from advantageous bidding conditions and a high level of interest in our bid packages. Pepper, Perkins & Will, and district staff were presented an overview of the referendum, timeline, and specifics related to this first important phase in the Board of Education's Workshop in March 2024
Building Level Addition Details
Lower Level
Lower Level renovations and improvements during the Enabling Phase include:
- Interim Classrooms
- (3) Flexible Learning Spaces
- Formerly Graphic Arts and
- Photo Lab
- Bathrooms
- Individual and Stacked Bathrooms (three bathrooms on three floors, developed simultaneously for efficiency)
- HVAC Updates
- LED Lighting Improvements
- Electrical Equipment
- Roofing
- Fire Sprinkler Expansion
Level 1
Level 1 renovations and improvements during the Enabling Phase include:
- Secured Entry
- Secured Entry Desk and Transaction Window
- Door Replacement
- Building Access Control
- Art Department
- Art Department Suite
- Photography Lab
- Graphic Arts Lab
- Painting
- Bathrooms
- Individual and Stacked Bathrooms (three bathrooms on three floors, developed simultaneously for efficiency)
- HVAC Updates
- LED Lighting Improvements
- Electrical Equipment
- Roofing
- Fire Sprinkler Expansion
- Historic Window Test Restoration
Level 2
Level 2 renovations and improvements during the Enabling Phase include:
- Second Floor of Library
- IT Department
- Flexible Learning Spaces
- (2) Classrooms with breakout rooms
- Bathrooms
- Individual and Stacked Bathrooms (three bathrooms on three floors, developed simultaneously for efficiency)
- HVAC Updates
- LED Lighting Improvements
- Electrical Equipment
- Roofing
- Fire Sprinkler Expansion